
MEP Projects
MEP Projects
Mechanical, electrical, and plumbing design consultancy across completed developments.

Millennium IT
Colombo, Sri LankaMillennium IT Software (Pvt) Ltd, a multinational IT service provider and subsidiary of the London Stock Exchange, retrofitted its former building into a new Network Operating Center. Spanning an area of 13,940.5 m², the project commenced in April 2015.
To size and optimize the mechanical ventilation and air conditioning (MVAC) systems, the engineering team at GreenArc utilized whole-building energy simulation.

Wild Coast Tented Lodge - Yala
Yala, Sri LankaLocated adjacent to Yala National Park, the Yala Wild Coast Tented Lodge project spanned 29,739.7 m² and was executed from January 2015 to June 2018.
GreenArc engaged to provide the complete back-of-house MEP design.

Progress Apparel Bangladesh
Dhaka, BangladeshSpanning 12,172.3 m² across two buildings, the Progress Apparel project was executed from May 2016 to March 2018, with both facilities successfully achieving LEED Gold Certification.
GreenArc consulted as the MEP designer and LEED Consultants.